Early Implementation of Scheduled Hosting Maintenance.
The originally scheduled maintenance at 16h00 has been brought forward to now (14h30).
The originally scheduled maintenance at 16h00 has been brought forward to now (14h30).
As a result of a large denial of service attack followed by transit BGP route updates…
One of our hosting filer units has stopped responding, likely due to a hardware fault.
We have experienced a partial power failure at Equinix PA2 at 10:07 CEST.
Our Paris datacenter experienced a partial electrical outage that impacted some of our services.
Centralnic, is now offering you their 26th domain name extension.
Due to large DDoS attacks against hosts within the Gandi Network, network connectivity is suboptimal.
As a result of the last 2 episodes, we are going to proceed with a preventative maintenance on the other hardware.
The problem encountered yesterday on a hosting filer is occuring on another unit since 14:45 (Paris).
We have detected an anomaly on a hosting filer impacting several customer servers.
The Gandi Mail service is currently under heavy load due to a multitude of botnets in Asia and Eastern Europe.
Due to an equipment failure some services are unavailable (blog admin, mail)